We anchor recovery work from sea bed at No.14 anchorage, Mokpo Korea which was cutted & drowning anchor by MV NEW LEGEND RUBY in Jun, 2019.
- Diver Team & Crane Barge to be mobilized to the worksite by tug boat
- Crane Barge to be moored by 4 point anchor mooring at the worksite.
- Diver team to be searched anchor & chain underwater at the worksite during stand of tide time.
- Marker Buoy with PP Rope to be installed at the exact position of anchor & chain.
- Sling wire to be connected with anchor & chain.
- Anchor & Chain to be lifted on the crane barge.
- After completion of the work, they will be demobilized to the Mokpo Inner Harbour.
- Anchor & chain to be discharged on the shore in Mokpo.